Risk Matrix Tool

Risk Matrix Tool

By Job Safety OnTheGo Pty

Risk Matrix Tool is a productivity utility for safety professionals to calculate hazard ratings and manage safety documentation on mobile devices.

The App DNA

What makes this app unique?

The tool removes the friction of manual, paper-based hazard assessments by providing a digital, customizable framework for field-based safety compliance.

For Safety professionals and field workers who need to perform JSA, JHA, and SWMS hazard assessments on the go.

What does it look like?

Key features

Customizable Risk Matrix Editoredge

Allows users to define their own risk assessment parameters and matrix structure instead of relying on default templates.

Generic Risk Matrixstandard

Pre-configured safety assessment framework for immediate hazard rating calculations.

Mobile Hazard Calculationstandard

Enables calculation of safety ratings for JSAs, JHAs, and SWMS directly from a mobile device.

How much does it cost?

freeFree access to all features

Risk Matrix Tool operates as a free utility with no visible IAP or subscription gates, serving as a specialized tool for safety professionals.

Velocity

Dormant developmentopaqueShow more...

The app has reached a zombie state, with no updates recorded in over a year. The last release occurred 392 days ago, and the iOS platform has not seen an update in 964 days. Development activity has effectively ceased, as there have been no feature additions or maintenance patches in the recent window.

See all version history

Who built it?

Job Safety OnTheGo Pty

5 apps tracked · Productivity

Pre-start OnTheGoPre-start OnTheGoJSA-OnTheGoJSA-OnTheGoPre-start OnTheGoPre-start OnTheGoJSA OnTheGoJSA OnTheGo
Explore the full publisher profile

User Sentiment

What do users think recently?

Review voice lately leans thrilled. Users appreciate beginners find the health and safety content accessible and useful for learning foundational concepts.

How are ratings & reviews evolving?

App Store
0.00 · 0
Google Play
0.00 · 0

What users say, by theme

What Users Love
  • Beginners find the health and safety content accessible and useful for learning foundational concepts

3 of 3 recent reviews analyzed · limited sample

Read the full review analysis

Competition

Competitive landscape for Risk Matrix Tool

How's the Productivity market?

Risk Matrix Tool occupies a niche utility segment within the Productivity category, focusing on specialized safety documentation. The absence of recent feature updates suggests a stable, maintenance-focused position rather than a growth-oriented one.

Read the market outlook

The rivals identified

Unlock the deeper market read.

Access the full report for free

The Analyst's Read

Key takeaways for Risk Matrix Tool

Where is it heading?

The market for safety documentation tools is shifting toward cloud-integrated, collaborative platforms that sync across teams. Risk Matrix Tool remains a standalone, device-local utility, which limits its utility for large-scale safety management but keeps it accessible for individual field workers.

  • The 13-month release gap indicates a maintenance-only posture, which limits the potential for new user acquisition but preserves the core utility for existing professionals.

The SWOT

Core Strengths
  • Customizable risk matrix editor enables bespoke safety parameters for specialized field environments
Critical Frictions 1 weakness inside
Growth Levers
  • Integration of cloud-sync for multi-user JSA/SWMS collaboration would address the current limitation of device-local storage
Market Threats 1 threat identified

Next best moves

1 Maintain

Audit platform compatibility requirements because the 13-month update gap risks OS-level deprecation → maintain functional utility

The counter-intuitive read

The lack of feature updates is a feature…

Read the full take

Since the last report: The app's competitive status shifted from a declining, high-risk maintenance state to a stable, niche-utility position. This change reflects a re-evaluation of the app's lack of updates as a deliberate, stable design choice for professional users rather than an indicator of imminent obsolescence.

Bottom line

Risk Matrix Tool provides a functional, niche utility for safety documentation, but the lack of active development limits its long-term viability. Maintaining the current codebase is essential to prevent OS-level deprecation, which would render the tool unusable for field professionals.

Unlock 1 critical friction, 1 market threat and the analyst’s take.

Access the full report for free

FAQ

Is Risk Matrix Tool suitable for professional safety compliance?
Risk Matrix Tool provides a framework for JSA, JHA, and SWMS hazard assessments, but users should verify that the customizable matrix parameters meet their specific organizational or regulatory compliance requirements.
Does Risk Matrix Tool require an internet connection?
The app is designed for mobile hazard calculation on the go, allowing users to perform assessments without an active internet connection.
What is the primary advantage of Risk Matrix Tool over standard templates?
The primary advantage is the customizable risk matrix editor, which allows users to define their own risk assessment parameters instead of being restricted to pre-configured templates.

Sources

  1. [1] Play Store listing

Report last updated

Disclosure: Independent intel to help mobile builders succeed.

AI-powered analysis with automated quality gates, built from publicly available sources. Marlvel.ai is not affiliated with, endorsed by, or sponsored by Risk Matrix Tool, its developer, the app publisher, Apple, or Google Play. All trademarks, logos, and screenshots referenced remain the property of their respective owners.

What's new

The app's competitive status shifted from a declining, high-risk maintenance state to a stable, niche-utility position. This change reflects a re-evaluation of the app's lack of updates as a deliberate, stable design choice for professional users rather than an indicator of imminent obsolescence.

shifted

Outlook Trend Adjustment

shifted

SWOT Narrative Refinement

Cite this report

Marlvel.ai. “Risk Matrix Tool Intelligence Report.” Updated Aug 30, 2026. https://marlvel.ai/apps/risk-matrix-tool

Agent Markdown (.md)See methodologyContact support